Interior completely gutted and rebuilt. Bilge bulkheads replaced. mast step replaced. Hull to deck joint replaced. Newfound Metals stainless port lites. Rebuilt M35B diesel, all new drive train, new control panel, 30 hours on all. brand new working jib, main and 150 jib old. All blisters on hull repaired and barrier coated with West Systems. Motor down the mississippi to Florida, no need to haul/transport.